Inquiry brief
Plastic Jars Sourcing inquiry brief
This page is the intake sheet for a rigid-jar factory request. Plastic Jars Sourcing is an independent sourcing partner: we collect a written brief, then look for plants that can answer that same line. Brand configuration lists no public street, switchboard or social account, so none of those channels is invented here. A usable request already names construction, quantity unit and a US destination. Optional budget and supplier preference can stay blank until they help the comparison. No published discount percentage is offered because this desk has no same-spec quote pair on file.
- Named construction: resin (PET, PP, HDPE, SAN or PETG), overflow or fill capacity in ml or oz, neck finish such as 58-400, 70-400 or 89-400, single-wall or double-wall, and whether the lid and liner travel as a matched set or a paired row. Snap closures and child-resistant closures are different objects from a continuous thread.
- Quantity and unit: pieces or cartons for that one construction. Mixing a 250 ml PET jar with an 89-400 wide-mouth PP jar in one cell hides converting time and cavity work. Keep 5,000-piece and 20,000-piece SKUs on separate lines when the die line or color count differs.
- Destination: US state or postal code plus the requested delivery window. Freight belongs on its own row, not as a silent cut inside the piece price.
- Decoration and samples: silk screen, pad print, shrink sleeve, or a pressure-sensitive label with a rewind specification if the label arrives on roll. State die line status. Ask for a plain structure sample, a printed proof, or both; sample freight sits apart from the piece price.
- Documents: a resin sheet plus a food-contact or migration testing file only if the fill needs them. Post-consumer recycled content is a lot percentage on a mill file, not a homepage badge. Oxygen transmission rate or water vapor transmission rate figures, if required, come from a named liner or barrier note.
No published street, phone or discount percentage. Reply timing is set after the submitted text is readable. There is no advertised service clock and no mapped office. Artwork, die lines and material files can be requested after the inquiry is open; this form has no upload field.
Factory quote comparison
Same spec, quantity and destination on every line. Include product specification, quantity, destination country or region and requested delivery window. Optional budget and supplier preference merge into the same requirement field when JavaScript is available; otherwise write them in the box. No existing factory quotation is required to submit. A sent form is a brief, not an order.
- Resin, capacity, neck finish, wall and lid or liner
- Print method, color count, die line status and sample needs
- Quantity unit and US state or postal code
- Optional budget with currency and per-unit or whole-order basis
After the first reply you can send a die line or a food-contact file by the channel we name. Preference for high-end, mid-range or budget converting describes color control, document depth and how much mill-run resin substitution you will accept if it is still named on the quote. It is a buying preference, not a verified factory rating. Ahrefs US matching-term labels observed 2026-09-12 inform page intent only. A 2026-09-15 look at a third-party packaging coordinator quote page shows a brief-first sequence; that observation is a process note, not this site's factory roster. Seal initiation temperature belongs on an induction-liner note when that closure is requested; it is not a property of the rigid jar wall. Continue remaining matching checks on plastic jars wholesale matching after you send the requirement, and close open artwork gaps on Artwork & Samples.